
Construction time:2015 Completion time:2018 Project area: Volume of steel:1,680t
Project description: This project consists of steel structure, shell with 117m long and 71m wide, steel frame, link bridge & stair. Value engineer design, Connection design, Shop drawing, fabrication and erection.
Bright spot: AISC, ASTM, AWS, SSPC