Construction time:2018 Completion time:2021 Project area: 281,555㎡ Volume of steel:20,200t
Project description:Capacity: 92,044 seats; Comply with BS EN; Full trial assembly and virtual assembly with 3D scan; Long distanced modular transportation by SPMT; Adjustable modular hoisting technique and max segment weight 480t using strand jack by 1650t crawler crane; De-propping with high precision; Work scope: shop drawing, fabrication and erection.
Bright spot:Main Stadium for Qatar 2022 FIFA Word Cup

Construction time:2018 Completion time:2021 Project area: ㎡ Volume of steel:20,200t
Project description:Capacity: 92,044 seats; Comply with BS EN; Full trial assembly and virtual assembly with 3D scan; Long distanced modular transportation by SPMT; Adjustable modular hoisting technique and max segment weight 480t using strand jack by 1650t crawler crane; De-propping with high precision; Work scope: shop drawing, fabrication and erection.